Once the system restarts, run the following tests to confirm a successful installation:

| Time Block | Activity | Critical Notes | | :--- | :--- | :--- | | | Site Setup & Anchor Placement | Surveying must be millimeter-perfect for BEAMD columns. | | 12h - 24h | BEAMD Ground Level | Erect columns. Apply rapid-set grout. | | 24h - 36h | BEAMD Upper Levels | Erect beams. Install temporary bracing. | | 30h - 48h | ATIR Phase 1 | Parallel Workflow. While upper beams go up, crews install ATIR straps on lower levels. | | 48h - 60h | ATIR Phase 2 | Tensioning and locking of straps. Torque verification. | | 60h - 72h | Final Inspection & QC | Ultrasonic testing of BEAMD bolts; tension release test on ATIR samples. | atir strap and beamd with 72 install

In a 140 mph wind zone, ASCE 7-16 calculates uplift pressure at roughly 30 psf. That’s on that connection. The ATIR strap with a proper 72-inch installation (continuous fastening over 6 feet) distributes that load across 24+ fasteners, each rated for ~100 lbs in withdrawal. The math works. Once the system restarts, run the following tests

If using SDS screws, torque to manufacturer spec (typically 90-110 in-lbs). Check that no gap exists between the strap and wood. A gap of more than 1/32” voids the load rating. | | 24h - 36h | BEAMD Upper Levels | Erect beams

footer-backgroundfooter-background-mobile
Mood_KeyartRenders_DarkEnchantress_Workfile 2
ESRB_RP_17+PEGI CENTRE
Atlas Link Online © 2026. All rights reserved. Lords of the Fallen and the CI Games are registered trademarks of CI Games SE.
1
1234567890
1234567890
%

PLEASE CONFIRM THAT YOU ARE OVER 18 YEARS OLD TO CONTINUE